Wednesday, August 11, 2021

Slipformed Concrete

  In the slipforming method, the formwork is moved continuously in sync with the concreting process in a 24-hour operation. The formwork, including the working platform and the hanging scaffold mounted internally or on both sides, is fixed to the jacking rods in the center of the wall. The hydraulic oil operated lifting jack raises […]

The post Slipformed Concrete first appeared on Civil Engineer Blog.

Via Home http://www.rssmix.com/

No comments:

Post a Comment